TLC provided survey and design services in Rocky Mountain District area, BC.
Services included:
- - Engineering assessment of the site
- - Survey with using conventional total station
- - Hydrological and hydraulic study of the crossing
- - Design /drafting of three structures: 27.4m Composite Steel Girder Bridge, 18.3m Non-composite Steel Girder Bridge, 15.6m Non-Composite Steel Girder Bridge
All deliveries were completed on time and on budget to the client satisfaction.